Skip links

Basilica San Gaudenzio, Novara

Almost twenty years after the automatic lighting system was built by us in 1997, and following an initial intervention in 2010 to upgrade the Digilux VM 3000 control system, we were asked to revamp the lighting system with LED technology lighting fixtures.

Our intervention has kept the lighting result of the previous intervention unchanged, improving the energy efficiency of the system and considerably reducing the visual impact of the lighting fixtures.

Categoria: Anno di realizzazione: 2016
#FullSpeedAhead
Contact us

Discover all our project