BUNGE

New electrical and automation systems Silos quay 1-21 levels

april 2021

Realization of electrical and instrumental systems serving the new quay silos levels for which it was necessary to implement systems by creating a new remote PLC expansion which required, among others, a new installation and cabling of a fiber optic network and a new power pipeline, new backbones inside the silos, at height and along the access walkways, as well as the installation, connection and testing of level control instruments.