“ALLIANZ STADIUM”, TURIN

Six – months’ intervention from august 2016

Measurements of illuminance levels according to the FIGC and UEFA standards

Execution at the Allianz Stadium, headquarter of Juventus FC, of the lighting levels aimed at the six-monthly verification ​​of horizontal illuminance values as well as vertical ones and relative uniformity as established by the FIGC Rules (Approval of the National Licensing System for admission to the Serie A Professional Championship, Infrastructure Criteria) and the UEFA guidelines (Stadium Lighting Guide 2016). The lighting reliefs are also carried out every six months in the emergency configuration.

Image Gallery